Skip to main content
iRubric: Hand Sewing Button Rubric

iRubric: Hand Sewing Button Rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Hand Sewing Button Rubric 
I can correctly sew on three buttons. I can follow technical reading directions. I can be a supportive classmate.
Rubric Code: XXX8W2W
Ready to use
Public Rubric
Subject: Vocational  
Type: Assignment  
Grade Levels: 6-8

Powered by iRubric Criteria
  Wow

4 pts

Almost There

3 pts

On the Way

2 pts

Not Yet

1 pts

Students Grade

(N/A)

Instructors Grade

(N/A)

Stitches

Wow

All stitches are neat and free of any loops. The needle consistently went in and out of the same holes
Almost There

Most stitches are neat and free of any loops. The needle mostly went in and out of the same holes.
On the Way

Some stitches are neat and free of any loops. The needle sometimes went in and out of the same holes.
Not Yet

Most stitches are untidy with many loops. The needle rarely went in and out of the same holes. Some stitches go over the edge of the button or over the edge of the fabric.
Students Grade
Instructors Grade
Shank

Wow

Thread was snugly wrapped about 5 times under the button to produce a shank. The fabric lies flat and doesn't pucker.
Almost There

Thread was wrapped about 5 times under the button to produce a shank but the fabric puckers.
On the Way

Thread was inconsistently wrapped under the button. The fabric puckers
Not Yet

Student forgot to wrap a shank.
Students Grade
Instructors Grade
Knots

Wow

The knots on the back of the fabric are consistently neat. The ends of the threads are cut close to the knot.
Almost There

The knots on the back of the fabric are for the most part neat or the ends of the threads weren't cut close to the knot
On the Way

The knots are inconsistent (too big or too small, perhaps with loops). The ends of thread weren't cut close to the knot.
Not Yet

Student forgot to knot the thread.
Students Grade
Instructors Grade
Time Management

Wow

Completed 100% of the steps in the allotted time.
Almost There

Completed 75% of the steps in the allotted time.
On the Way

Completed 50% of the steps in the allotted time.
Not Yet

Completed less than 25% of the steps in the allotted time.
Students Grade
Instructors Grade
Clean Up

Wow

Student cleaned up room on a daily basis. They made sure everything was put away properly.
Almost There

Student helped clean up thoroughly with few prompts.
On the Way

Student helped clean up but needed several prompts.
Not Yet

The student did not help clean up the room.
Students Grade
Instructors Grade



Keywords:
  • Hand sewing button

Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16