Tramming a vertical Milling Machine Head 
To be used in technical manufacting and machining classes to assess how well students are able to apply theory knowledge to accomplish an assigned task.
Rubric Code: VC2B89
Ready to use
Public Rubric
Subject: Vocational  
Type: Assessment  
Grade Levels: 9-12

Powered by iRubric Machine Shop Skills
  Advanced

4 pts

Proficient

3 pts

Basic

2 pts

Below Basic

1 pts

Unacceptable

0 pts

Machine Zero's
10 %

Was the X & Y axis zero set and machine trammed to tolerance of .001

Advanced

10 Pts<BR>
All machine zero's are set correctly and tram is zero
Proficient

7.5 Pts<BR>
All machine zero's are set correctly and tram is within .001
Basic

5 Pts<BR>
All machine zero's are set correctly and tram is more than .001 but less than .003
Below Basic

2.5 Pts<BR>
one zero was correctly set the other not.
Unacceptable

0 Points<BR>
Student has no clue both zero's were incorrectly set.
Machine and ring free from burrs.
15 %

Sharp edges & burrs have been removed.

Advanced

15 pts<BR>
Set-up is completly free from sharp edges and nicks.
Proficient

11.25 Pts<BR>
Only the table has been checked to be free from sharp edges and nicks.
Basic

7.5 Pts<BR>
Only the ring has been checked to be free from sharp edges and nicks.
Below Basic

3.75 Pts<BR>
student needs promted to check for sharp edges,nicks and burrs.
Unacceptable

0 Points<BR>
student has been promted to check for sharp edges,nicks and burrs but has no clue what to do.
Demonstration of program knowledge.
15 %

and essential tools

Advanced

10 pts<BR>
Student knows and is able to identify and explain necessary theories for completion of the project. Student had/gathered all materials and was completely ready to go to work.
Proficient

7.5 Pts<BR>
Student is able to identify and explain necessary theories for completion of the project with some assistance. Student had/gathered most materials and went to work. .
Basic

5 Pts<BR>
Student is unable to identify or explain concepts. Student had/gathered most materials, however, they needed excess time.without major prompting.
Below Basic

2.5 Pts<BR>
Student is not able to both identify and explain major theories. Student did not have/gather some of the needed materials to perform required task.
Unacceptable

0 points<BR>
Student is unable to either identify or explain any related theories to the project. Student did not have/gather the needed materials and was unable to perform required work.
Level of Needed Assistance
5 %

Advanced

5 Pts<BR>
Student was able to complete the task without assistance.
Proficient

3.75<BR>
Student was able to complete the task with little assistance.
Basic

2.5 Pts<BR>
Student was able to complete the task with moderate assistance.
Below Basic

1.25 Pts<BR>
Student was unable to complete task without major assistance.
Unacceptable

0 Points<BR>
Student was unable to complete task with assistance.
Time Management
5 %

Advanced

5 Pts<BR>
Routinely used time well throughout the project to get the job done on time. 0 to 10 minutes
Proficient

3.75 Pts<BR>
Used time fairly well throughout the project. 10 to 15 minutes to finish
Basic

2.5 Pts<BR>
Procrastinated somewhat but did get the job done on time. 15 to 20 minutes to finish
Below Basic

1.25Pts<BR>
Was unable to adequately meet timeline due to inablility. 20 to 30 minutes to finish
Unacceptable

0 Points<BR>
Did not meet timeline due to procrastination or wasting time. student did not finish in rquired time
Application of Safety Practices
20 %

Advanced

20 Points<BR>
Student followed all safety rules.
Proficient

15 Points<BR>
Student followed most safety rules, may have forgotten one on occasion.
Basic

10 Points<BR>
Student attempted to follow safety rules but failed to meet several.
Below Basic

5 Points<BR>
Student failed to follow a significant number of safety rules often.
Unacceptable

0 Points<BR>
Student made no effort to follow safety rules.
Pride in Workmanship
30 %

and care of machine tools and cleanup

Advanced

20 Pts<BR>
Work reflects student's best efforts. Student took great care of the precision tools & and equipment that he or she used. All tools where retuned to tool room & the machine and work area was cleaned properly.
Proficient

15 Pts<BR>
Work reflects a strong effort from this student. Student took some care with the precision tools & equipment. Work area & machine where particaly cleaned. Some tools not returned to tool room..
Basic

10 Pts<BR>
Work reflects a moderate effort from this student. Little care was taken with tools & machine. Few tools where returned to the tool room. Machine and work area not cleaned.
Below Basic

5 Pts<BR>
Work reflects some effort from this student. Student failed to take care of tools and or did not clean the machine.
Unacceptable

0 Points<BR>
This student shows no pride or effort in thier work. Student was careless with tools & machine, resulting in broken tools or equipment. Student did not return tools to the tool room and also did not clean the machine
Comments and Feedback



Keywords:
  • Project Grading Rubric







Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98