Marshmallow Toothpick Bridge Building 
Rubric Code: UXX3774
Ready to use
Public Rubric
Subject: Science  
Type: Project  
Grade Levels: 6-8

Powered by iRubric Forces Acting on Structures:
100 % Popsicle Stick Bridge
  Level 1

10 pts

Level 2

15 pts

Level 3

20 pts

Level 4

25 pts

Sturdiness

Level 1

Bridge collapsed under minimum weight requirement
Level 2

Bridge held the minimum weight, but no more.
Level 3

Bridge held 2+ additional weights.
Level 4

Bridge held 5+ additional weights.
Structure

Level 1

Bridge with no real design.
Does not span a gap of 20 centimeters (unstable or incomplete).
Did not maximize use of materials.
Level 2

Bridge with limited creative design.
Spans a gap of 20 centimeters, but remains unstable or incomplete in some way.
Limited use of materials.
Level 3

Bridge designed with good creativity.
Spans a gap of 20 centimeters, is complete and stable.
Good use of materials.
Level 4

Bridge designed with excellent creativity.
Spans a gap of 20 centimeters is complete and stable.
Excellent use of materials.
Teamwork

Level 1

Partners ..no team work.. one person ran the show!
No respect shown.
Level 2

Partners ..some team work.
Some respect shown.
Level 3

Partners were working together, but occasionally distracted from their project in some way.
Respect was observed most of the time.
Level 4

Each person was actively involved in the building process. All partners were treated with respect.
Blueprint

- sketch
- post building
reflection

Level 1

Bridge design does not match the design of the blueprint and changes were not explained.
Level 2

Bridge design somewhat matches the design of the blueprint.
If any changes were made during building, they were explained a little upon reflection.
Level 3

Bridge blueprint mostly matches the design of the finished product.
If any changes were made during building, they were sufficiently explained upon reflection.
Level 4

Bridge blueprint matches the design of the finished product.
If any changes were made during building, they were thoroughly explained upon reflection.



Keywords:
  • bridge, structures, forces, science


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98