Skip to main content
iRubric: Heart Coaster Sewing Project rubric

iRubric: Heart Coaster Sewing Project rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Heart Coaster Sewing Project 
Used to evaluate sewing projects
Rubric Code: S246C49
Ready to use
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: 9-12, Undergraduate

Powered by iRubric Sewing Project Rubric
  Excellent

10 pts

Good

5 pts

Poor

1 pts

Cutting

Excellent

All cutting lines are straight and trimmed seams are all even
Good

Cutting lines are straight and most of trimmed seams are even
Poor

Cutting lines are not straight and trimmed seams are uneven
Seams

Excellent

Seams are correct in width and construction.
Good

Seams are wider or narrower than what are called for in some places.
Poor

Seams are puckered OR they are wider than what the instructions call for OR seams are too narrow, sometimes missing the fabric.
Stitching

Excellent

Stitching is even & neat. No loops or missed spots. Closure shows no raw edges.
Good

Stitching mostly even, with a few loops where presser foot was raised. OR raw edges are visible at closure.
Poor

Stitching has several areas where presser foot was raised AND raw edges are visible on closure.
Stuffing/Filling

Excellent

Stuffed and filled very evenly.
Good

Good attempt at stuffing or even filling.
Poor

Project shows little to no evidence of stuffing or even filling.
Neatness/Clean

Excellent

Project is clean and shows no evidence of finger prints
Good

Project is clean, but shows evidence of finger prints
Poor

Project looks dirty or stained and shows evidence of finger prints
Threads

Excellent

All threads were trimmed during the sewing process
Good

Some threads were trimmed during the sewing process
Poor

Threads were not trimmed during the sewing process
Backstitching

Excellent

All seams were backstitched during the construction process
Good

Most seams were backstitched during the construction process
Poor

Seams were not backstitched during the construction process
Time Management

Excellent

Project was turned in on time or early
Good

Project was turned in on time.
Poor

Project was turned in late - after the due date
Clean Up

Excellent

The student cleaned up room on daily basis and helped others.
Good

The student only cleaned up their area when reminded.
Poor

The student did not help clean up their area.
Your Score _______/90



Keywords:
  • Coaster


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98