Skip to main content
iRubric: Popsicle Stick Bridge Building rubric

iRubric: Popsicle Stick Bridge Building rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Popsicle Stick Bridge Building 
All bridges must be made out of popsicle sticks and white or wood glue. The bridge must span distance of 30 centimeters.
Rubric Code: JX977C2
Ready to use
Public Rubric
Subject: Science  
Type: Project  
Grade Levels: 6-8

Powered by iRubric Forces Acting on Structures:
100 % Popsicle Stick Bridge
  Level 1

17.5 pts

Level 2

20 pts

Level 3

22.5 pts

Level 4

25 pts

Appearance

Level 1

Not aesthetically pleasing (shapes, patterns, colour, etc.)

Work is sloppy throughout.

Design is unattractive and/or plain.
Level 2

Limited aesthetics
(shapes, patterns, colour, etc.)

Design and use of glue is messy at times.

Some visual appeal.



glue use..messy
Level 3

Overall, an attractive bridge (shapes, patterns, colour, etc.)

Tidy work most of the time.

Visually appealing.
Level 4

Extremely aesthetic in design (shapes, patterns, colour, etc.)

All constuction is clean and attractive.

Visually appealing.
Structure

Level 1

Bridge with no real design.


Does not span a gap of 20 centimeters (unstable or incomplete).

Did not maximize use of materials.
Level 2

Bridge with limited creative design.

Spans a gap of 25 centimeters, but remains unstable or incomplete in some way.

Limited use of materials.
Level 3

Bridge designed with good creativity.

Spans a gap of 30 centimeters, is complete and stable.

Good use of materials.
Level 4

Bridge designed with excellent creativity.

Spans a gap of 30+ centimeters is complete and stable.

Excellent use of materials.
Teamwork

Level 1

Partners ..no team work.. one person ran the show!

No respect shown.
Level 2

Partners ..some team work.


Some respect shown.
Level 3

Partners were working together, but occasionally distracted from their project in some way.

Respect was observed most of the time.
Level 4

Each person was actively involved in the building process. All partners were treated with respect.
Blueprint

- sketch
- prewriting
description
- post building
reflection

Level 1

Bridge design does not match the design of the blueprint and changes were not explained.
Level 2

Bridge design somewhat matches the design of the blueprint.

If any changes were made during building, they were explained a little upon reflection.
Level 3

Bridge blueprint mostly matches the design of the finished product.

If any changes were made during building, they were sufficiently explained upon reflection.
Level 4

Bridge blueprint matches the design of the finished product.

If any changes were made during building, they were thoroughly explained upon reflection.



Keywords:
  • bridge, structures, forces, science


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16