Skip to main content
iRubric: Knitted Scarf rubric

iRubric: Knitted Scarf rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Knitted Scarf 
Rubric Code: D9W959
Ready to use
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Knitted Scarf
Enter rubric description
  INCOMPLETE

5 pts

DEVELOPING

7 pts

COMPETENT

9 pts

SUPERIOR

10 pts

Knit (& Purl) Stitches

The appearance of stitches.

INCOMPLETE

The stitches look inconsistent and messy.
DEVELOPING

Stitches show signs of uniformity, but quality varies.
COMPETENT

Skill developed as scarf progressed. At the end, stitches were done consistently and correctly.
SUPERIOR

All stitches were done correctly, which creates a scarf that looks uniform and neat.
Width

Are stitches counted and maintained consistently

INCOMPLETE

Less than 70 percent of the scarf is of consistent width.
DEVELOPING

70 percent or more of these scarf is of consistent width.
COMPETENT

90 percent or more of the scarf is of consistent width.
SUPERIOR

Stitches were counted and scarf is consistent width from beginning to end.
Length

Is it long enough to be a functional scarf

INCOMPLETE

The scarf was attempted but was less than 10 inches long and not wearable as a scarf
DEVELOPING

The scarf was attempted but was between 10-15 inches long
COMPETENT

The scarf was attempted but was between 15-20 inches long
SUPERIOR

The scarf was completed and at least 21 inches long
Finishing

INCOMPLETE

Not cast off or finished.
DEVELOPING

Cast off, but yarn tails were not woven in.
COMPETENT

Cast off stitches done well. Yarn tails woven in some and trimmed, but easily spotted.
SUPERIOR

Cast off stitches done correctly. Yarn tails woven in securely and trimmed.
Work Ethic

INCOMPLETE

Project not completed by end of term.
DEVELOPING

Worked off and on in class, worked some at home, not turned in on time but project is finished by Dec 21
COMPETENT

Worked off and on in class, worked some at home, not turned in on time but project is finished by Dec 14
SUPERIOR

Worked everyday in class, worked some at home, turned in on time and project was finished by Dec 7
Aesthetics

INCOMPLETE

Not wearable.
DEVELOPING

Skill is developing; next scarf would be of good, wearable quality.
COMPETENT

Looks well made; some flaws in technique, but easily hidden or disguised as design choice.
SUPERIOR

Scarf looks professionally made; something you would purchase at a boutique.



Keywords:
  • Knit

Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n16