Skip to main content
rubric gallery

rubric gallery

rubrics by eubankschad

 public gallery
find rubric
   Filters
rubrics by eubankschad
See a list of rubrics by eubankschad. Copy rubrics to your zone. Bookmark rubrics for future use Build, share, exchange, and reuse rubrics. Find rubrics by category and type.

Click on rubric title to preview, edit, print, copy, or do more with it.

Popup Preview Quickly preview a rubric in a popup window.
Found 6 Rubrics   (showing Rubrics 1 thru 6 )  
Please login to view pages 2 - 1
6
Rubrics
 Title      Built By 
1 rubric Installation of Gas Furnace       popup preview  
Students will install a Gas Furnace

Grade levels:   9-12  
eubankschad
2 rubric Electrical Board       popup preview  
Install a contactor, Fan Coil relay, sequencer, transformer, thermostat on a board and correctly wire all the components.

Grade levels:   9-12  
eubankschad
3 rubric Preventative Maintenance Contract       popup preview  
Create a PM contract service plan that you would use for your company. Include logo, name, what services you provide, and the benefits of the program.

Grade levels:   9-12  
eubankschad
4 rubric Copper Pipe Project       popup preview  
Students must complete copper pipe by brazing, swaging, flaring, and pressure testing pipe for leaks. Supplies Needed: 20" piece of 3/8 copper 2- flare nuts 1- union connecter. 1- access port Students must put a swage joint at 5" and another one at 14" and the flare connection is at 18" with the end crimped and soldered and the access port in the front end is soldered.

Grade levels:   9-12  
eubankschad
5 rubric Iron Pipe       popup preview  
Working in groups of 4 you will construct a rectangle out of iron pipe using 1/2" pipe. Materials needed: 4- 1/2" elbows 1- 1/2" Tee 1- 1/2" Union 2- 6" pieces threaded on both sides 2- 6 1/4" pieces threaded on both sides 2- 9 1/4" pieces threaded on both sides

Grade levels:  
eubankschad
6 rubric Copper Pipe Project       popup preview  
Students must complete copper pipe by brazing, swaging, flaring, and pressure testing pipe for leaks. Supplies Needed: 20" piece of 3/8 copper 2- flare nuts 1- union connecter. 1- access port Students must put a swage joint at 5" and another one at 14" and the flare connection is at 18" with the end crimped and soldered and the access port in the front end is soldered.

Grade levels:   9-12  
eubankschad


Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n98